Lamination hijinks
Apr. 30th, 2004 06:03 pmGot called back to work last night because our sales department made a mistake, and had forgotten to pass word that the artwork for a large job had been approved and moved off the hold board. So I had to print and laminate (and correct the spelling of) a couple of dozen large posters, plus spend some extra time cleaning up after my *own* error -- namely, setting up the machine backwards and laminating one of the rubber rollers rather than the paper. No permanent damage done, but I don't think I'll charge them for the entire time I was there :/
We're short two salesfolk, and currently the department consists of a single full-time woman. So I've been cutting her a lot of slack ... and she's buying me lunch Monday.
Off to breakfast with my spoose shortly, and shall try to have as much quality time as I can before I head off to D&D.
We're short two salesfolk, and currently the department consists of a single full-time woman. So I've been cutting her a lot of slack ... and she's buying me lunch Monday.
Off to breakfast with my spoose shortly, and shall try to have as much quality time as I can before I head off to D&D.